- Driving up to 25 km from the shop
- Unpacking and visual inspection of the heat pump
- Installation of interior parts up to 2.5 meters above the floor, on the inside of the outer wall
- Installation of outdoor units up to 1.5 meters above ground level
- Drilling in standard wooden wall/leca up to 30 cm thickness
- 2 wall brackets and 4 vibration dampers (for outdoor unit)
- Up to 4 meters of piping (white plastic duct, pipe, power cable, signal cables)
- Electrical connection between indoor and outdoor up to 4 m
- Grounded cable 2 m with plug. Daikin and Bosch: On the outside. On Toshiba and most Panasonic you can choose inside or outside
- Proper sealing of penetrations in the wall
- Commissioning and testing of the heat pump
- User guide for the customer